| Description | Lovato part number | |-------------|--------------------| | RGAM 12, 1-pole ON/OFF | RGAM 12 S1 | | RGAM 12, 2-pole ON/OFF | RGAM 12 S2 | | RGAM 12, 3-pole ON/OFF | RGAM 12 S3 | | RGAM 12, changeover 2-pole | RGAM 12 C2 | | RGAM 12, voltmeter switch (3 positions) | RGAM 12 V |
Once you clarify, I’ll be happy to help appropriately.
The most critical part of using the is correctly setting the overload current. An incorrect setting will either cause nuisance tripping or fail to protect the motor. lovato 31 rgam 12 user manual
Configure delays for generator start, transfer, and shutdown to prevent nuisance tripping. 5. Troubleshooting and Alarms The 31 RGAM 12 has a built-in event log and alarm system.
I can provide the exact steps or values for your specific setup. Share public link Configure delays for generator start, transfer, and shutdown
: Provide a walkthrough of the installation process. This might involve connecting the device to a power source, configuring settings, and ensuring it's properly secured.
Forces the generator to fire up under simulated emergency conditions. Depending on how parameters are configured, it can test engine readiness with or without transferring the actual building load. Comprehensive Wiring & Input/Output Mapping I can provide the exact steps or values
Buttons for OFF , MANUAL , and AUTOMATIC modes.
Toggles the 3-digit LED window through line voltages, phase values, frequencies, battery charge, and engine running hours. 3. Four Distinct Operating Modes
Install a CT on phase L1. Connect the secondary terminals (S1 and S2) of the CT to the corresponding current input terminals on the controller.
For systems tracking load metrics, secondary terminals on Current Transformers must be terminated correctly to match their designated voltage phases. Ensure all secondary transformer wires are securely grounded to prevent high-voltage spikes on open circuits. Setup and Parameter Programming